05.10.09_my.frt.area.rubbish.dump
9 October 2005 - More than two weeks later and no further work has taken place on the wall. A large, grey plastic box has been left lying around, and the ground is filthy
05.10.09_my.frt.area.rubbish.wrks.not.fnshd
9 October 2005 - The close-up of the wall shows that no further work has taken place since 28 June 2005 i.e. in over three months
05.11.03_my.frt.area.ladder_rubbish.dump
3 November 2005 - Works to the wall have finally been completed. Hence, one year and three months after the start of the works in August 2004. However, the area in front of my windows is now used for storage i.e. long metal ladder. The area is also filthy
06.02.02_my.frt.area.rubbish.dump
2 February 2006 - The close-up shows that the whole ledge of my windows is covered with detritus, which includes large black pieces.The ground is also filthy
06.02.02_my.frt.area.rubbish.dump2
2 February 2006 - Photograph showing the extent of the filth in front of my windows