Previous page 2 of 4 Next
05.06.26_flooring.entrance3
26 June 2005 - The new flooring covers a large part of the main entrance
05.06.26_flooring.entrance4
26 June 2005 - Another close-up showing that the new flooring is affixed directly onto the joists with nothing in between. This is Mr Ladsky's et. al's interpretation of the standard of works required for a "prestigious block in Knightsbridge"
05.06.26_flooring.entrance5
26 June 2005 - Photograph taken from the floor below through the open flap of the ceiling. It clearly shows that the new flooring in the main entrance has been placed directly onto the joists, without any insulation
05.06.26_flooring.entrance6
26 June 2005 - Close-up of base slats and new flooring v. bottom part of the entrance to a flat
05.07.03_main.entrance.from.stairs
3 July 2005 - View of the entrance from the top of the staircase coming from the corridor where my flat is located. Some sort of cardboard has been placed over the new flooring. Note the state of the stairs
05.09.04_main.entrance5
4 September 2005 - ONE YEAR since the start of the works. Carpet has been placed over the part of the floor previously showing the base slats. Cardboard has been cellotaped over the whole area where the new flooring has been placed